Skip to main content
Keyway Concrete Co. · GR, MI

Residential concrete · Grand Rapids, MI

Concrete poured for Michigan winters.

Driveways, patios, stamped work, slabs, walks and repair. We build the base you never see, cut the joints on purpose, and print the price per square foot before you sign anything.

Concrete sliding down a truck chute into sidewalk forms while a finisher rakes it level, with a backhoe and houses behind
Pour day · 4 in walk on 4 in of 21AA · Wyoming, MI

$8 to $12

per sq ft for broom finish, base and steel included

4,000 psi

air-entrained mix on every outdoor pour

6 in

of compacted 21AA gravel under every driveway

2 days

from site visit to a written, itemized quote

A concrete company that shows its math.

Most bids are one number on the back of a business card. Ours list the square footage, the finish, the price per square foot, the tear-out and the minimum, line by line.

If two bids are $3,000 apart, you should be able to see exactly why. Usually it is the base, the steel or the tear-out. Sometimes it is just a better finish.

Six services

What we pour

All services and specs

Base, steel, mix, joints

What is under the slab decides how long it lasts.

Once the forms come off, nobody can see the base or the steel. So we write them down. Five things most bids leave vague, and every Keyway quote spells out:

  1. 01 How deep the base is, and whether it gets compacted in lifts
  2. 02 What steel goes in, and whether it sits on chairs or on the dirt
  3. 03 The mix: strength in psi, and whether it is air-entrained
  4. 04 Where the joints go, and how deep they are cut
  5. 05 Which way the water runs when it is done
Loader spreading crushed gravel for a new driveway base
Day one on most driveways: soft soil out, 21AA gravel in, compacted in two lifts before a single form goes down.

Top: Broom finish, curing compound on day 0, sealer after day 28

4 in

Slab: 4,000 psi, air-entrained, fiber in the batch
Steel: Wire mesh on chairs, held at mid-depth

6 in

21AA crushed gravel, compacted in two lifts

Native soil, soft spots dug out and replaced

Control joint: 1/4 of slab depth Mesh shown dashed at mid-depth

Printed on pour day

The cure clock

Concrete hardens by chemistry, not by drying. These are the dates on the card we tape to your door.

Curing questions

Day

0

Pour day

Placed, finished and sprayed with curing compound. Joints are cut within hours. Keep kids, pets and sprinklers off.

Day

1-2

Feet

Walk on it with care after 24 to 48 hours. No bikes, no dragging grills or furniture across it.

Day

7

Cars

Drive and park passenger cars after 7 days. Keep tires off the outer edges for another week.

Day

28

Full strength

Close to full design strength. Moving vans and dumpsters are fine, and the first sealer can go on.

Cool weather slows everything down. Below about 50°F, add two or three days to each step. We write your actual dates on the card.

Price per square foot

Five finishes, five honest ranges.

Every range includes digging, the gravel base, forms, steel, the mix, joints and curing. Tear-out is listed separately so you can compare bids line by line. Small pours have a $2,400 minimum.

Full price list

Know your size?

Put in a length and a width. The estimator takes it from there and shows every multiplication.

24 ft × 20 ft = 480 sq ft

Before you sign anything

Four honest notes about concrete.

Cracking

Concrete cracks. We decide where.

Every slab shrinks as it cures. Control joints, cut a quarter of the slab deep and no more than 10 ft apart on a 4 in slab, give that crack a straight, hidden path. A hairline crack inside a joint is the slab doing its job. A crack that crosses a panel and opens wider than 1/8 in is ours to look at.

Cracking questions

Curing

Walk in 2 days, drive in 7, full strength in 28.

Concrete does not dry, it hardens through a chemical reaction that needs water and warmth. We spray a curing compound to hold the water in. Your job is patience: feet after 24 to 48 hours, cars after 7 days, heavy trucks after 28.

Curing questions

Sealing

Wait 28 days, then seal on a schedule.

Sealer keeps water and salt out of the surface. It goes on after the slab has cured for at least 28 days. Penetrating sealer on broom finishes lasts 3 to 5 years; the acrylic on stamped work wants a fresh coat every 2 to 3 years.

Sealing questions

Freeze-thaw

No salt the first winter. Ever on ammonium.

Water soaks in, freezes, expands and pops the top layer off. That is scaling. Air-entrained mix and a proper finish stop most of it. Your part: no deicer at all the first winter (use sand), and never fertilizer-based ammonium deicers after that.

Freeze-thaw questions

Reviews

After a winter, not after the pour.

4.8

Average of the 10 reviews on this site, including the two 4-star ones.

Read all reviews
“Three bids, and Keyway was the only one who explained what was going under the slab. They dug out a lot more soft clay than I expected and showed me before charging for it. Two winters in, no flaking.”
Megan R., Kentwood Driveway replacement · June 2025
“Good work, clear prices. A hairline crack showed up in one panel the first winter and I was annoyed. They came out, showed me it was inside the joint, and sealed it anyway. Fair enough.”
Patricia K., Grandville Driveway and apron · October 2024
“I called asking for a new driveway. Amira told me mine was still level and solid and sold me a $900 clean, joint seal and seal instead. Who does that?”
Lena M., Grand Rapids Clean, seal and joint sealing · September 2025

Recent pours

See the gallery

Next step

Get your price per square foot, in writing.

Tell us what you want poured and roughly how big. We walk the site, check the base and the slope, and send a written quote within two business days.

Fictional sample site by SearchPod