Foundations and slabs

Footings and frost walls for garages and additions, garage and shop floors, shed and accessory-building slabs. Inspected, below the frost line, square to the plan.

Cross-section of a frost-protected footing, frost wall and floor slab, with six numbered parts explained in the list below. frost line 42 in 1 2 3 4 5 6
  1. 1. Footing, 20 in wide by 8 in thick, poured after the inspector signs off on depth and steel
  2. 2. Two continuous #4 bars in the footing
  3. 3. Frost wall, 8 in poured concrete, vertical bar per the drawings
  4. 4. Anchor bolts set in the wet wall to hold the sill plate
  5. 5. 4 in slab on 6 in of compacted gravel, vapor barrier under heated floors
  6. 6. Bottom of footing at least 42 in below grade, under the frost line
Frost depth
Footings at least 42 in below grade, the West Michigan standard
Footings
Typically 16 to 20 in wide, 8 in thick, two continuous #4 bars
Frost walls
8 in poured walls, vertical bar per the drawings, anchor bolts set
Price
footings from $55 per ft

Scope

What we pour

Structural work is a different job from a patio. It runs on drawings and inspections, and it has to be square, level and below the frost line the first time. We pour footings, frost walls and slabs for detached garages, additions, sheds and accessory buildings, and we pour garage and basement floors. We work from your plans or your builder's, and we schedule around the building inspector.

  • 01 Footings and frost walls for detached garages and additions
  • 02 Garage, shop and pole-building floors
  • 03 Shed and accessory-building slabs with thickened edges
  • 04 Basement floor replacement after the old one is removed
  • 05 Pier footings for decks, porches and pergolas

Specification

Built like this

This is what goes on the written quote. If another bid does not say these things, ask.

Frost depth
Footings at least 42 in below grade, the West Michigan standard
Footings
Typically 16 to 20 in wide, 8 in thick, two continuous #4 bars
Frost walls
8 in poured walls, vertical bar per the drawings, anchor bolts set
Floors
4 in slab, 5 to 6 in for shops, on compacted gravel
Under heated slabs
10 mil vapor barrier and rigid insulation per the plans
Inspections
Footing inspection before every pour; we book it
Tolerance
Square within 1/4 in corner to corner, level within 1/4 in

Prices

What it costs

  • Footing and frost wall

    Per linear foot, 42 in deep, typical garage

    $55 to $95 per ft

  • Garage or shop floor, 4 in

    Inside finished walls; 5 to 6 in add-on below

    $7 to $10 per sq ft

  • Shed or accessory slab

    Thickened edges, mesh, anchor bolts

    $8 to $12 per sq ft

  • Basement floor, new

    After removal; barrier and gravel included

    $9 to $14 per sq ft

Ranges include digging, gravel base, forms, steel, mix, joints and curing unless a line says otherwise. Where you land in a range depends on access for the truck, how much soft soil comes out and how complicated the shape is. The firm number comes after the site visit and does not move unless the scope does.

Before you sign

Honest notes

Cracking

Floors get joints too, laid out with your bays and doors. Footing and wall cracks wider than 1/8 in are what our warranty is for.

Curing

Framing on footings and walls can start after about 3 to 7 days, depending on weather. We tell your framer the date.

Sealing

Garage floors see salt from the car. A penetrating sealer after 28 days helps; epoxy coatings are a separate trade we can refer.

Freeze-thaw

Below the frost line is the whole point. Footings poured shallow heave. We never pour on frozen ground, and we blanket fresh work in cold snaps.

Schedule

How the job runs

  1. Before

    Plans and permit

    We work from your stamped drawings or your builder's; the building permit is yours or your builder's.

  2. Day 1

    Dig and form

    Excavation to 42 in, footing forms and steel set.

  3. Day 2

    Inspection, then pour

    The inspector signs off on the steel and depth before a truck is called.

  4. Days 3 to 5

    Walls

    Wall forms set, bolts placed, walls poured, forms stripped.

  5. Later

    The floor

    Floors are poured once the structure is closed in, or before, on simple sheds.

A front loader spreading crushed gravel over a long, freshly dug base beside a lawn while a worker in a safety vest watches
Base work before forms go in. Compaction in lifts matters more than anything poured on top.

Questions

Asked about foundations

Do you repair foundations?

No. Lifting, piers, wall bracing and basement waterproofing are a different trade. We pour new footings, walls and slabs.

Do you do full house basements?

We pour garages, additions and accessory buildings directly for homeowners. Full new-home basements we do for builders, on their schedule.

Can you pour in winter?

Footings and floors inside a heated, closed-in building, yes. Outdoor footings only with heated blankets and an accelerated mix, and never on frozen ground.

All questions Next: Sidewalks, walkways and steps

Next step

Get your foundations price in writing.

Tell us what you want poured and roughly how big. We walk the site, check the base and the slope, and send a written quote within two business days.