DW · P-01 · Driveways

Concrete driveways

Tear-out and replacement, new drives, widening and aprons. Built on 6 inches of compacted gravel, with steel in the slab and joints cut the same day.

A freshly poured, broom-finished concrete driveway with straight control joints dividing it into panels
Thickness
4 in for cars. 5 in for heavy pickups, RVs, trailers or a boat.
Base
6 in of 21AA crushed gravel, compacted in two lifts
Mix
4,000 psi, air-entrained (5 to 7% air), fiber in the batch
Price
from $8 per sq ft

Scope

What we pour

A driveway takes the worst of a Michigan year: plow blades, salt tracked in on tires, water that freezes and thaws dozens of times. Ours start with the part you never see. We dig out the old base, compact new crushed gravel in lifts, set the steel on chairs so it sits in the middle of the slab, and slope the whole thing so water runs away from the garage.

  • 01 Tear-out and replacement of cracked, sunken or flaking driveways
  • 02 New driveways for new homes, garages and additions
  • 03 Widening a single drive for two cars, or adding a parking pad
  • 04 Garage aprons and the city approach, with the right-of-way permit
  • 05 Matching walks and steps poured the same day

Specification

Built like this

This is what goes on the written quote. If another bid does not say these things, ask.

Thickness
4 in for cars. 5 in for heavy pickups, RVs, trailers or a boat.
Base
6 in of 21AA crushed gravel, compacted in two lifts
Mix
4,000 psi, air-entrained (5 to 7% air), fiber in the batch
Steel
Wire mesh on chairs. #4 rebar grid at 24 in as an upgrade.
Joints
Every 10 ft or less, 1 in deep, cut within 6 to 18 hours
Slope
At least 1/8 in per foot, away from the garage and house
Finish
Light broom across the slope, for grip in the wet

Top: Broom across the slope, cure compound day 0, sealer after day 28

4-5 in

Slab: 4,000 psi, air-entrained, fiber in the batch
Steel: Wire mesh on chairs, or #4 rebar at 24 in

6 in

21AA crushed gravel, compacted in two lifts

Native soil, soft spots dug out and replaced

Control joint: 1/4 of slab depth Mesh shown dashed at mid-depth

Prices

What it costs

  • Broom finish, new

    Base, steel, joints and cure compound included

    $8 to $12 per sq ft

  • Tear-out and haul-away

    Added to the line above when replacing

    $2.50 to $4.50 per sq ft

  • 5 in thick upgrade

    Heavy vehicles

    +$1.00 to $1.75 per sq ft

  • Colored or exposed aggregate

    See the finish table

    $10 to $17 per sq ft

Worked example

Two-car replacement, 20 × 24 ft

  1. Area 24 ft × 20 ft = 480 sq ft
  2. Broom finish: 480 sq ft × $8 to $12 $3,840 to $5,760
  3. Tear-out and haul-away: 480 sq ft × $2.50 to $4.50 $1,200 to $2,160

Range, rounded to $50 $5,000 to $7,950

Run your own numbers

Ranges include digging, gravel base, forms, steel, mix, joints and curing unless a line says otherwise. Where you land in a range depends on access for the truck, how much soft soil comes out and how complicated the shape is. The firm number comes after the site visit and does not move unless the scope does.

Before you sign

Honest notes

Cracking

Expect joints every 10 ft or so; that is where the shrinkage crack goes. We line them up with the garage door edges so they look planned, because they are.

Curing

Cars after 7 days. Garbage trucks, moving vans and dumpsters stay off it for 28 days, and nobody parks on the outer edges in week one.

Sealing

A driveway gets more salt than any other slab. Seal at day 28 or later, then every 3 to 5 years with a penetrating sealer.

Freeze-thaw

No deicer at all the first winter. Shovel early, use sand for grip, and keep the plow blade raised a hair off the surface.

Schedule

How the job runs

  1. Week before

    Layout and permit

    We paint the outline, check the slope with a laser and file the approach permit if your drive meets a city sidewalk.

  2. Day 1

    Tear-out and base

    Old slab out and recycled, soft soil dug out, 21AA gravel placed and compacted in two lifts.

  3. Day 2

    Forms and steel

    Forms set to grade, mesh or rebar on chairs, expansion joint at the garage.

  4. Day 3

    Pour and finish

    Truck arrives early. Placed, screeded, floated, edged, broomed, sprayed. Joints cut that evening or next morning.

  5. Day 4

    Forms off

    Forms pulled, edges backfilled with topsoil, cure card in your hand.

  6. Day 10

    Drive on it

    Seven days after the pour, cars are fine. We check in by text.

Crew in rubber boots placing concrete while one finisher runs a power screed along the form
Pour day: one finisher on the power screed, two on the rakes, the forms already set to the slope.

Questions

Asked about driveways

Can you pour over my old driveway?

No. A new slab on top of a cracked one copies every crack within a winter or two, and it raises the drive above the garage floor. We tear out and rebuild the base.

Should my driveway be 4 or 5 inches?

Four inches is right for cars and light pickups on a good base. If you park a heavy truck, an RV, a trailer or a boat, or get regular dump-truck deliveries, go to 5 in. It adds about $1.00 to $1.75 per square foot.

Do I need a permit?

Usually only for the approach, the piece between the city sidewalk and the street. We file it and pass the fee through at cost.

All questions Next: Concrete patios

Next step

Get your driveways price in writing.

Tell us what you want poured and roughly how big. We walk the site, check the base and the slope, and send a written quote within two business days.

Fictional sample site by SearchPod