0.THE DESIGN PROCESS · 7 PHASES
9-MONTH MEDIAN · CONSULT TO HANDOVER

Seven phases.
Nine months, on average.

From the first conversation on the land to handover, a typical Verdant project runs nine to fourteen months. Each phase has named deliverables; the contract specifies them. Below: the full sequence, with a brief on what we ship in each.

I.PHASE I · FIRST CONVERSATION, ON THE LAND
WK 0
I
WK 0

First conversation, on the land

Ninety minutes, no fee. We walk the site with you, no drawings yet. Most first conversations end with a brief — a one-pager that captures what we heard.

Phase I deliverables
  • Site walk · 90 min
  • Brief · one page
  • No fee
II.PHASE II · SCHEMATIC DESIGN
WK 1 — 8
II
WK 1 — 8

Schematic design

Topographic survey by an outside firm. From the survey: schematic site plan, plant palette, materials specification, preliminary cost. Two design reviews with the client.

Phase II deliverables
  • Topographic survey
  • Schematic plan + sections
  • Plant palette (preliminary)
  • Materials brief
  • Preliminary cost estimate
III.PHASE III · DESIGN DEVELOPMENT
WK 9 — 16
III
WK 9 — 16

Design development

Detailed drawings: planting plan, lighting, irrigation, drainage. Construction documents at 60%. Final cost estimate. City permits applied for where needed (most projects need at least one).

Phase III deliverables
  • Construction drawings · 60%
  • Lighting + irrigation plans
  • Drainage detail
  • Final cost estimate
  • Permit submission
IV.PHASE IV · CONSTRUCTION DOCUMENTS
WK 17 — 22
IV
WK 17 — 22

Construction documents

100% CDs. Permit issued. Schedule confirmed. Crew assigned. The build starts when permit + schedule + crew all converge.

Phase IV deliverables
  • Construction documents · 100%
  • Permit issued
  • Crew assigned (foreperson named)
  • Schedule confirmed
V.PHASE V · BUILD
WK 23 — 36+
V
WK 23 — 36+

Build

Verdant runs the build with two foreperson teams. Stonework, planting, hardscape, irrigation. Weekly site review with the client; daily logs from the foreperson. Walk-throughs at hardscape complete and at planting complete.

Phase V deliverables
  • Daily site logs
  • Weekly client review
  • Hardscape walk-through
  • Planting walk-through
VI.PHASE VI · HANDOVER
WK 36+
VI
WK 36+

Handover

Final walk-through with the principals. As-built drawings delivered. One-year warranty on every plant and material. Stewardship contract signed if the client wants ongoing care (most do).

Phase VI deliverables
  • Final walk-through
  • As-built drawings
  • 1-year warranty document
  • Stewardship contract (if requested)
VII.PHASE VII · STEWARDSHIP · YEAR-ROUND
WK 36+ ONGOING
VII
WK 36+ ONGOING

Stewardship · year-round

Monthly visits in growing season; quarterly otherwise. Plant replacement at no charge in year one. Annual review with photographs and a plant census — the same census format as the original schedule.

Phase VII deliverables
  • Monthly visits · spring/summer/fall
  • Quarterly · winter
  • Plant replacement · yr 1 free
  • Annual review + plant census
VIII.COLOPHON · THE PROCESS

Begin at
Phase I.