The Westwind · Now reserving
South Lake Union, redefined.
A 19-story luxury condominium with 64 residences ranging from studios to penthouses. Designed by Olson Kundig. Targeted closings Q4 2027.
The Westwind
64
Residences
19
Stories
$875K
Starting price
Q4 2027
First closings
Architecture + design
Designed by Olson Kundig
Olson Kundig (architect)
International recognition for material-forward residential and cultural projects across the West Coast.
Atelier Cole (interior design)
Pacific Northwest interiors firm — known for material restraint and texture.
Walker Macy (landscape)
Site, lobby gardens, rooftop terrace, ground-level public realm.
Specifications
Material + system specs
Building envelope
Passive House envelope target. Triple-pane windows. Continuous exterior insulation.
Mechanical
Variable refrigerant flow (VRF) heating + cooling. Heat-pump water heaters. ERV ventilation.
Sustainability
LEED Platinum target. Solar PV on rooftop. EV-ready garage with 80% chargers.
Finish standards
Three packages: Northgate (standard), Westwind (upgraded), Atelier (designer).
Sound
Concrete + premium-spec wall assemblies. STC-60 between residences. Floor isolation system.
Connectivity
Pre-wired CAT-6 + fiber. Cellular DAS. Touchless entry, package management, package-locker integration.
Configure
Build your residence
Reserve your unit
Pick a floorplan, view, finishes, and deposit tier. Reservations are non-binding for 30 days, then convert to a contract or refund.
Floorplan
View premium
Finishes package
Parking
Storage
Deposit tier
Estimated total
$1,372,000
- Floorplan: B2 — 1 BR (920 sqft)$1,295,000
- View premium: Standard view$0
- Finishes package: The Northgate (standard)$0
- Parking: Single space$65,000
- Storage: Small unit (40 cuft)$12,000
- Deposit tier: Standard ($25K)$0
Estimated closingQ4 2027 closing
Priority positionTier 3 (standard)
Decision window30 days
Construction
Where we are
- 1Q3 2024Foundation completeBelow-grade structure and parking garage poured.
- 2Q2 2025Topping outBuilding reached its full 19-story height.
- 3Q1 2026 (current)Envelope + interior buildoutCladding nearly complete; interior trades underway.
- 4Q3 2026Reservation window closesFinal reservations accepted; construction continues.
- 5Q4 2027First closingsLower floors deliver first; remaining floors through Q1 2028.