Building envelope
Passive House envelope target — triple-glazed insulating glass, continuous exterior insulation, thermally broken aluminum mullions.

162 residences. 24 storeys. One harbour view, divided 162 ways. Reservations are open through Q1 2028 or until the last residence is placed — whichever comes first.
Forty-year practice. Vancouver Public Library, the Living Shangri-La, the Telus Garden development. Restraint at scale.
Material-forward Pacific Northwest practice. Two finish palettes — limestone and chestnut — applied uniformly across the building, no upgrade tiers.
23rd-floor terrace garden, lobby courtyard, ground-level public realm. Mature plantings on day one — no decade-long fill-in.
Passive House envelope target — triple-glazed insulating glass, continuous exterior insulation, thermally broken aluminum mullions.
Centralized heat-recovery + variable refrigerant flow heating/cooling. Heat-pump domestic hot water. ERV ventilation in every residence.
LEED Platinum target. 240 kW rooftop PV array. EV-ready throughout — 80% Level-2 charging on day one.
Concrete construction. STC-60 demising assemblies. Floor isolation system on every level.
CAT-6 + fiber to every unit. Cellular DAS. Smart-home pre-wire ready for Lutron + Sonos.
Touchless entry. Concierge desk staffed 7am–11pm. Package room + parcel lockers. Visitor management system.
Three-lot consolidation finalized; development permit submitted to City of North Vancouver.
Public hearing approval. Reservation centre opens at 132 Lonsdale; first 30 units placed in week one.
Currently active. 3,200 cubic metres of soil removed; shoring + pile driving complete.
All 24 storeys structurally complete; envelope work begins.
Final 25% of residences released to public; pricing adjusts +6%.
Lower floors close + occupy first; full building occupancy by Q4 2028.
Pick a floorplan, view, finish package, and deposit tier. We submit the reservation immediately; finance and binding contract follow within 30 days.