Architectural rendering of luxury residential tower
The Westwind · Now reserving

South Lake Union, redefined.

A 19-story luxury condominium with 64 residences ranging from studios to penthouses. Designed by Olson Kundig. Targeted closings Q4 2027.

The Westwind
64
Residences
19
Stories
$875K
Starting price
Q4 2027
First closings
Architecture + design

Designed by Olson Kundig

Olson Kundig (architect)
International recognition for material-forward residential and cultural projects across the West Coast.
Atelier Cole (interior design)
Pacific Northwest interiors firm — known for material restraint and texture.
Walker Macy (landscape)
Site, lobby gardens, rooftop terrace, ground-level public realm.
Specifications

Material + system specs

Building envelope
Passive House envelope target. Triple-pane windows. Continuous exterior insulation.
Mechanical
Variable refrigerant flow (VRF) heating + cooling. Heat-pump water heaters. ERV ventilation.
Sustainability
LEED Platinum target. Solar PV on rooftop. EV-ready garage with 80% chargers.
Finish standards
Three packages: Northgate (standard), Westwind (upgraded), Atelier (designer).
Sound
Concrete + premium-spec wall assemblies. STC-60 between residences. Floor isolation system.
Connectivity
Pre-wired CAT-6 + fiber. Cellular DAS. Touchless entry, package management, package-locker integration.
Configure

Build your residence

Reserve your unit

Pick a floorplan, view, finishes, and deposit tier. Reservations are non-binding for 30 days, then convert to a contract or refund.

Floorplan
View premium
Finishes package
Parking
Storage
Deposit tier
Estimated total
$1,372,000
  • Floorplan: B2 — 1 BR (920 sqft)$1,295,000
  • View premium: Standard view$0
  • Finishes package: The Northgate (standard)$0
  • Parking: Single space$65,000
  • Storage: Small unit (40 cuft)$12,000
  • Deposit tier: Standard ($25K)$0
Estimated closingQ4 2027 closing
Priority positionTier 3 (standard)
Decision window30 days
Construction

Where we are

  1. 1
    Q3 2024
    Foundation complete
    Below-grade structure and parking garage poured.
  2. 2
    Q2 2025
    Topping out
    Building reached its full 19-story height.
  3. 3
    Q1 2026 (current)
    Envelope + interior buildout
    Cladding nearly complete; interior trades underway.
  4. 4
    Q3 2026
    Reservation window closes
    Final reservations accepted; construction continues.
  5. 5
    Q4 2027
    First closings
    Lower floors deliver first; remaining floors through Q1 2028.

Reserve before Q3 2026 closes.

Get ProposalInstant SEO Audit