Skip to main content
tessera Kitchen + Bath · Denver

From a fresh face to a new floor plan, designed and built by one team.

Kitchen remodeling

Remodeled white kitchen with a marble waterfall island wrapped in vertical oak slats, brass faucet, and three counter stools
Typical range
$30,000 to $140,000+
Time on site
3 to 10 weeks on site, depending on scope
First step
Free design consultation

Most kitchens we build are for people who already love their house and are tired of fighting the room they cook in. We design around how you actually use it, then build it with our own crew and project manager.

A kitchen remodel starts with a conversation, not a catalog. We ask who cooks, who sits at the island, where the mail lands, and what drives you crazy now. Then we measure, draw it, and price it before anything is ordered.

Some kitchens need a refresh: new counters, fronts, lighting, and a backsplash on the layout you have. Others need a wall out and an island in. We will tell you honestly which one your budget and your house point to.

What's included

  • Design, 3D drawings, and every selection made with your designer
  • Permits, inspections, and any structural engineering
  • Demolition, framing, plumbing, electrical, and drywall
  • Cabinets, counters, tile, lighting, and appliance install
  • One project manager and a written update every Friday
  • Daily cleanup and a dust wall around the work zone

What it costs

Denver metro, 2026. Ranges, not quotes.

  • Kitchen refresh

    Same layout: new counters, fronts or paint, backsplash, lighting, sink and faucet

    $30,000 to $50,000

  • Full remodel, same layout

    New cabinets, counters, flooring, lighting, and appliances in place

    $55,000 to $95,000

  • Layout change

    Move the sink or range, open a wall, add an island; may include a beam

    $80,000 to $140,000+

Ranges include design, permits, labour, and our typical mid-to-upper finishes. Appliances are usually extra, and older homes with surprises behind the walls can run higher. Your fixed price comes after design, before you commit to the build.

Remodeled white kitchen with a marble waterfall island wrapped in vertical oak slats, brass faucet, and three counter stools

Project story · Washington Park

The galley wall came out

A narrow 1950s galley became an open kitchen with a waterfall island that seats three.

Scope
Kitchen, layout change
Budget range
$98,000 to $112,000
Timeline
6 weeks design, 10 weeks on site
Read the full story

Good questions

Can we live at home during a kitchen remodel?

Almost always, yes. We seal the kitchen behind a zip wall, set up a temporary sink and counter in another room when we can, and clean up every day.

Do I have to buy appliances through you?

No. Many clients buy their own. We just need the model numbers early so the cabinets are built to fit them.

How long before work starts?

Design usually takes 4 to 6 weeks. Cabinets take 6 to 10 weeks to arrive after you sign off. We start demolition when the cabinets are close, so your kitchen is out of service for as short a time as possible.

Let's look at your kitchen.

Book a free design consultation in the showroom. Bring photos and a budget range; leave with honest numbers.

Book a design consultation
Fictional sample site by SearchPod