Skip to content
Larkin Terrace: a long, low mid-century modern house with warm cedar siding, ribbon windows and a deep roof overhang above a terraced hillside garden

Modern · Renovation & addition · 2025

Larkin Terrace

Larkin Terrace, Alder Bay heights

A 1961 hillside modern, opened up and restored in cedar and mahogany. The addition reads as if the original architect simply kept drawing.

Style
Modern
Type
Renovation & addition
Size
4,100 sq ft
Bedrooms / baths
3 / 4
Budget band
$1.5M+
Design
6 months
Construction
13 months
Completed
2025

N-01 The program

What the house had to do

A 1961 post-and-beam house by a well-loved local architect, worn down by sixty years: mahogany ceilings under three layers of paint, single-pane glass, and a floor plan built for cocktail parties rather than the family of four who now owned it.

The project stripped the house back to its bones, restored what was worth restoring, and added a bedroom wing that steps down the hill on the original structural grid. Same rhythm, new verse.

N-02 The materials

The palette, and why

Restored mahogany ceilings
Stripped, sanded and oiled. Sixty years of paint came off one board at a time.
Steel-framed glazing
Thermally broken steel replaced the single-pane walls. The sightlines survived; the heating bill did not.
Poured terrazzo
Continuous through the kitchen and gallery, ground in place, with the stone mix matched to 1961 photographs.
Clear-sealed concrete block
The original chimney core, cleaned and left honest: the spine of the house, visible again.
Vertical cedar siding
Re-milled to the 1961 profile and finished in the original warm stain.

N-03 The timeline

As it actually ran

  1. Discovery 5 weeks

    A structural review of the original frame. The 1961 beams passed. The 1980s deck did not.

  2. Design & documents 6 months

    Every new detail was drawn against the original blueprints, which the owners found rolled up in a closet.

  3. Permitting 2 months

    Hillside soils review for the stepped addition, scheduled first so it never held up the line.

  4. Construction 13 months

    The family moved out. We are honest about that: nobody should live inside this much dust.

Final cost vs. signed budget
1.2% over (contingency included)
Move-in vs. promised date
On the promised day

Fictional figures for a demonstration project. Every project's results

N-04 The collaboration

Designed in-house

Designed in-house, with the original 1961 drawings pinned above the drafting table. The estimator priced restoring against replacing for every original element. The mahogany stayed because the numbers said it could, not on sentiment alone.

Our architect friends can't find the seam between 1961 and 2025. Hartwell knew that was the whole job.

The owners, Larkin Terrace · fictional

Begin

Curious what your version would cost?

That's exactly what a first meeting is for: your brief, this portfolio's real numbers, and an honest range said out loud.

The studio: studio@hartwellhomes.example · +1 (555) 019-2400

Fictional sample site by SearchPod