Skip to main content

Every plan includes unlimited users. Subs, owners and architects never pay. See pricing

Purlin

Product

Six modules that share one record of the job.

Most construction software is six tools wearing one logo. In Purlin, a daily log, an RFI, a sheet, a change order and a cost code are linked records, so following a problem from the deck to the budget takes clicks, not phone calls.

All modules

Every plan: 4 Builder and up: 2

Purlin modules, who uses them, offline support and plan
NameWho opens it mostWorks offlinePlanLink
Project management Project managers, supers, subs Lookahead and punch list Every plan View module: Project management
RFIs and submittals Project engineers, PMs, architects, subs Read and draft RFIs every plan · Submittals Builder+ View module: RFIs and submittals
Daily logs Superintendents, foremen Full Every plan View module: Daily logs
Job costing PMs, project accountants, owners Read only Builder and up View module: Job costing
Drawings Everyone on the job Downloaded sets Every plan View module: Drawings
Bid management Estimators, preconstruction No Builder and up View module: Bid management

Linked records

Four connections do most of the work. Each one replaces a phone call, an email chain or a spreadsheet someone keeps by hand.

  1. 01 Daily log links to RFI

    A delay noted in the field becomes a drafted RFI with the photos attached.

  2. 02 RFI links to Drawing

    The published answer pins itself to the sheet it changes, so the crew sees it there.

  3. 03 RFI links to Change order

    Mark a cost or time impact and a change event opens in job costing.

  4. 04 Bid links to Budget

    The awarded bid becomes a commitment against the right cost code.

01 · PM

Project management

Schedule, three-week lookaheads, punch lists and meeting minutes on one job.

  • Lookaheads by trade
  • Punch lists that close
  • Minutes that become tasks
Project management in detail
Schedule Trade: All
Activity
Week of Oct 13
Week of Oct 20
Week of Oct 27
M
T
W
T
F
M
T
W
T
F
M
T
W
T
F

L2 steel beams, grid A to D

Steel

60%

Beam pocket fix, C/4

Steel

RFI-042

L2 deck pour

Concrete

L1 mechanical rough-in

Mechanical

25%

Roof membrane

Roofing

L1 framing inspection

Inspection

L1 drywall hang

Drywall

Planned Done Held by an RFI Milestone Today

02 · RFI

RFIs and submittals

A log that shows whose court the ball is in, and how long it has been there.

  • Ball in court, always visible
  • Linked to the sheet
  • Linked to the money
RFIs and submittals in detail
RFIs New RFI
Search RFIs Status Ball in court
Sample RFI log
No.SubjectBall in courtDueStatus
RFI-042 Beam pocket conflict at grid C/4 Architect Oct 14 Open 3d
RFI-041 Door hardware set, corridor 104 Owner Oct 10 Overdue 2d
RFI-040 Slab edge detail at stair 2 Structural eng. Oct 16 Open 1d
RFI-039 Plumbing chase width, L1 Your team Oct 6 Answered
RFI-038 Roof drain locations Closed Oct 2 Closed

03 · LOG

Daily logs

Weather, crews, deliveries, delays and photos, filed from the truck. Works offline.

  • Offline is the default
  • Crew counts in seconds
  • Delays and deliveries on the record
Daily logs in detail
Today's logs
  • Riverside Clinic Addition

    R. Castillo · Delay flagged: steel at C/4

    Filed 4:41 PM
  • Larkspur lot 14

    D. Moreno · Drywall delivery received

    Filed 3:58 PM
  • Elm Street remodel

    K. Bauer · Will sync when the phone finds signal

    Saved on phone
  • Warehouse 9 tenant fit-out

    S. Ibarra · Reminder goes out at 5:30 PM

    Not filed yet

04 · COST

Job costing

Budget, commitments and change orders by cost code, synced with accounting.

  • Commitments count
  • Change orders with a trail
  • Two-way accounting sync
Job costing in detail
Budget Synced 6:02 AM
Sample budget versus actual, in US dollars
Cost code Budget Committed Actual Pending CO Projected Variance
03-300 Cast-in-place concrete 286,000 271,500 198,240 0 279,800 +6,200
05-120 Structural steel 412,000 389,400 301,120 4,850 418,900 -6,900
06-100 Rough carpentry 94,500 88,000 41,300 0 92,100 +2,400
09-250 Gypsum board 168,000 Not bought 0 0 168,000 0
22-000 Plumbing 236,000 228,700 96,400 2,100 237,600 -1,600
Job total 1,196,500 977,600 637,060 6,950 1,196,400 +100

Sample job. Variance = budget minus projected. Red means the code is trending over.

05 · DWG

Drawings

The current set on every tablet, with RFIs and punch items pinned to the sheet.

  • Title blocks read for you
  • One current revision
  • Overlay compare
Drawings in detail
Drawings
A-301 L2 framing plan Rev 3 · current
ABCD 1234 W16x26 W18x35 W16x26 3 RFI-042 Beam pocket PL-118 A-301 · L2 FRAMING · REV 3

06 · BID

Bid management

Bid packages, invites, Q&A and side-by-side leveling, then award into job costing.

  • Your directory, your subs
  • Know who is really bidding
  • Q&A answered once
Bid management in detail
Bids Due Oct 20

05 Structural steel package

  • 14 Invited
  • 11 Viewed
  • 6 Will bid
  • 4 Submitted
Sample bid leveling for the steel package
Scope Ridgeline SteelNorthfork Fab.Keel StructuralAshby Iron
Base bid $389,400$402,000$371,900$415,500
Shop drawings Included Included Included Included
Embeds and anchor bolts Included Included Excl. +$12,400 Included
Metal deck Included Included Excl. +$11,600 Excl. +$11,600
Erection and cranes Included Included Included Included
Leveled total $389,400 Lowest leveled $402,000 $395,900 $427,100

Fictional bidders. Exclusions get a plug price so every column covers the same scope.

Every module

The basics, on every plan.

next-step Ready

Bring one real job to the demo.

Thirty minutes with a former PM or superintendent. We load one of your RFIs and one of your drawings, and show you what your field crew would see tomorrow morning.

  • Plans from $199 / month
  • Users Unlimited, every plan
  • Trial 14 days, no card
  • Leaving Export everything, any time
Fictional sample site by SearchPod