Skip to content

Commercial & industrial GC · Est. 1998

S-11 About Meridian

Built by people who pour concrete

Meridian started in 1998 as a concrete contractor working for other builders. We became a general contractor so we could keep the promises ourselves, and we still self-perform the trades that set the schedule.

Construction crew silhouetted on a steel frame at sunrise, with tower cranes behind
Crews topping out structural steel at first light.

A-01 Our story

From foundations to whole buildings

Two concrete foremen and an estimator started Meridian in a rented yard in Calder Flats. For six years we poured foundations and slabs for other general contractors, and we watched good concrete get blamed for schedules that were never realistic.

In 2004 we took our first general contract, a cold-storage building, and made a rule we still follow: the trades that set the schedule stay on our own payroll. Today that means concrete, tilt-up, steel erection, rough carpentry and demolition, done by 120 craft professionals in Meridian colours.

We build for owners who check the numbers: manufacturers, health systems, school districts and logistics operators. They hire us because we price carefully, report honestly and tell them about problems the day we find them.

A-02 Milestones

Twenty-eight years, seven dates

  1. 1998

    Founded as a concrete contractor

    Two foremen and an estimator start Meridian in a rented yard in Calder Flats, pouring foundations for other general contractors.

  2. 2004

    First general contract

    A 60,000 SF cold-storage building. A young field engineer named Elena Vasquez joins the job.

  3. 2011

    Healthcare practice opens

    The first ICRA-governed project on a live hospital campus, and the protocols we still use.

  4. 2014

    Tilt-up division

    Our own crews start casting and flying panels, and distribution work becomes a core sector.

  5. 2019

    Elena Vasquez becomes president

    The company commits to self-performing every critical-path structural trade.

  6. 2023

    Apprenticeship partnership

    Paid craft apprenticeships with Calder Technical College, with rigging added as a track in 2026.

  7. 2026

    240 people, 120 of them craft

    About $310M of annual volume across manufacturing, healthcare, education and logistics.

A-03 How we work

Six rules we hold ourselves to

V-01

Bad news travels first

Owners hear about a problem the day we find it, with a plan attached. Surprises are the only thing we refuse to deliver.

V-02

Write it down

Estimates, schedules, decisions and promises live on paper with a date on them. Memory is not a project control.

V-03

Own the critical path

We self-perform the trades that set the schedule, so a promise about the date is a promise we can keep ourselves.

V-04

Stopping work is a right

Anyone on our sites can stop the work without explanation. Every one of them gets thanked for it.

V-05

Measure it or don't claim it

Safety, waste diversion, slab flatness, estimate variance. If we talk about it, we publish the number.

V-06

Hire, pay and teach properly

Published wage bands, paid apprenticeships and a field-to-office ladder that people are actually climbing.

Blue structural steel frame of a new commercial building rising under a clear sky

A-04 Our crews

120 craft professionals on our payroll

Our foremen plan their own look-aheads, our superintendents write their own daily logs, and about one in ten of our craft workers is a paid apprentice from Calder Technical College. When a schedule gets tight, we add a crew instead of sending an email.

A-05 The team

The people who sign the promises

Full leadership bios

Fictional people, invented for this demonstration.

Start / Bid room

Meet the team that would build it

Precon presents its own estimates, operations plans its own logistics, and the safety director walks your site before we price it. Start with the bid configurator or a call.

Bid room: bids@meridiancg.example · +1 (555) 014-7300

Fictional sample site by SearchPod