A three-storey outpatient pavilion with twelve ORs, built ten metres from a working emergency department.
Size
96,000 SF
Contract value
$74M
Duration
22 months
Delivery method
CM at Risk
Status
2024
Sector
Healthcare
Location
Northgate campus, Calder Valley Health
N-01/
The brief
Calder Valley Health needed twelve operating rooms and an imaging suite on the only buildable corner of a campus that could not stop working — ten metres from the emergency department ambulance bay, above an active loading dock, with utility tie-ins into a central plant running at capacity.
N-02/
The build
CM at risk from schematic design. Every task within reach of occupied space carried an ICRA; the ambulance bay stayed open through 22 months of construction via a phased logistics plan rehearsed with the ED charge team. Eleven utility shutdowns were executed — each with a written method statement, a rollback plan and facility engineering in the room. OR pressure relationships and the MRI vault's RF shield were pre-tested by third parties before state inspectors arrived.
N-03/
The handover
Passed state health-facility inspection on first presentation. Zero unplanned utility interruptions to the operating campus across 214,000 craft hours. GMP closed out with $1.1M in shared savings returned to the owner.