Veridian EV Components Plant

Larkspur Junction

A 320,000 SF assembly expansion with 60-ton crane rails and a substation of its own.

Size
320,000 SF
Contract value
$138M
Duration
20 months
Delivery method
Design-Build
Status
2025
Sector
Industrial & Advanced Manufacturing
Location
Larkspur Junction

N-01 The brief

Veridian's EV drivetrain line was sold out; the expansion had to add 320,000 SF of assembly space — with twin 60-ton crane runways and a dedicated substation — while the existing plant kept building units on the other side of a shared wall, three shifts a day.

N-02 The build

Design-build with vibration and dust protocols agreed with plant engineering before demolition of the shared wall began. Crane rails were surveyed at every splice and load-tested against vendor tolerances. The 25 MVA substation and medium-voltage loop were energized in a sequence rehearsed with the utility across four planned outages, none of which touched a production shift.

N-03 The handover

Handover met the owner's line-installation date with eight days' float. Production in the existing plant ran uninterrupted for all twenty months — the metric the plant manager cared about more than any other.

Start / Bid room

Planning something like Veridian EV…?

Tell the configurator the project type, size and delivery method — a preconstruction lead who has built in your sector responds within two business days.

Bid room: bids@meridiancg.example · +1 (555) 014-7300

Sample site by SearchPod