P-07 Industrial & Advanced Manufacturing

Veridian EV Components Plant

Larkspur Junction

A 320,000 SF assembly expansion with 60-ton crane rails and a substation of its own.

Size
320,000 SF
Contract value
$138M
Duration
20 months
Delivery method
Design-Build
Status
2025
Sector
Industrial & Advanced Manufacturing
Location
Larkspur Junction

N-01 The brief

Veridian's EV drivetrain line was sold out. The expansion had to add 320,000 SF of assembly space, with twin 60-ton crane runways and a dedicated substation, while the existing plant kept building units on the other side of a shared wall, three shifts a day.

N-02 The build

Design-build with vibration and dust protocols agreed with plant engineering before demolition of the shared wall began. Crane rails were surveyed at every splice and load-tested against vendor tolerances. The 25 MVA substation and medium-voltage loop were energized in a sequence rehearsed with the utility across four planned outages, none of which touched a production shift.

N-03 The handover

Handover met the owner's line-installation date with eight days' float. Production in the existing plant ran without interruption for all twenty months, the metric the plant manager cared about more than any other.

The owner's view

“We built drivetrains on the other side of that wall for twenty months and production never stopped once. That was the only number I cared about, and they never lost sight of it.”

Luis Ferreira, Plant Manager, Veridian EV Components Fictional reference

Start / Bid room

Planning something like this?

Tell the bid configurator the project type, size and delivery method. A preconstruction lead who has built in your sector replies within two business days.

Bid room: bids@meridiancg.example · +1 (555) 014-7300

Fictional sample site by SearchPod