Bathroom remodels
Waterproofed right, tiled straight, vented properly. The parts you never see are the parts we are fussy about.
The short version
Bathrooms fail behind the tile. A shower that looks fine on day one can rot a subfloor in five years if the waterproofing was rushed.
We build every wet wall with a tested waterproofing system, slope every shower pan correctly, and size the fan to actually clear the steam. Then we make it look good.
A good fit if
- You want a walk-in shower instead of a tub
- The tile, grout, or vanity is worn out or dated
- You see soft floors, loose tile, or water stains below
- You want grab bars, a curbless shower, or a wider door
- The bathroom has no real ventilation
What's included
- Layout and selection help for tile, vanity, and fixtures
- Plumbing and electrical permits where required
- Full tear-out down to the studs and subfloor check
- Tested waterproofing on every shower wall and pan
- Correctly sized, vented exhaust fan on a timer
- Tile, vanity, fixtures, glass, paint, and cleanup
What it costs in 2026
Ranges for Milwaukee County homes, not quotes. Your written ballpark comes within a week of the free site visit.
Powder room
Vanity, toilet, tile, lighting, and paint
$12,000 – $22,000
Hall bath update
Tub-to-shower conversion, vanity, tile, fan, fixtures
$22,000 – $36,000
Primary bath remodel
Larger shower, double vanity, heated floor option
$38,000 – $72,000
Accessible bath conversion
Curbless shower, grab bar blocking, wider door
$28,000 – $48,000
The honest part. Ranges include design help, permits, and mid-range tile and fixtures. Rot found under the old floor is repaired at a pre-agreed rate, written into your contract before we start.
Typical timeline
About 11 weeks, first meeting to final
-
Design and selections
2 to 4 weeks
-
Ordering and permits
2 to 4 weeks
-
Demo and rough-ins
1 week
-
Waterproofing and tile
2 weeks
-
Fixtures and finish
1 to 2 weeks
From the portfolio
Whitefish Bay primary bath
1938 Tudor revival · Whitefish Bay
A dated primary bath turned into a bright room with a double vanity, a walk-in shower, and a fan that actually works.
- Scope
-
- Full tear-out, subfloor repair, and new shower pan
- Tested waterproofing on all shower walls
- Patterned wall tile, double wood vanity, and brass fixtures
- Vented exhaust fan on a humidity sensor
- Heated floor on its own thermostat
- Timeline
-
Design 3 wk · Permits 1 wk · Build 6 wk. About 2 and a half months.
Total about 10 weeks. - Budget range
- $41,000 – $47,000
Questions people ask
All FAQsHow long does a bathroom remodel take on site?
Most hall baths take 3 to 5 weeks once we start. Primary baths with custom glass take 5 to 7. Ordering happens before demolition so the room is not torn out while we wait.
What if we only have one bathroom?
We will plan around it. Some clients rent a portable unit for the driveway; others stay with family for the two worst weeks. We tell you the exact days the toilet is out.
Do you do tub-to-shower conversions?
Yes, it is one of our most common jobs. We rebuild the drain and pan properly instead of dropping a shower base on the old tub drain.