Skip to main content

Lic. #ROOF-041877 · $1,000,000 surety bond · 15-yr workmanship warranty

Serving the Windrow Valley since 2004 · (555) 014-8830

Beacon. Roofing & Exteriors

Services · 01 of 04

A whole new roof, built from the deck up

Most valley roofs we replace are 20 to 25 years old and starting to curl, crack or leak. We strip them to the wood, fix what we find, and build the full system back. Most homes are done in one or two days.

Two roofers laying rows of dark asphalt shingles across a wide roof, seen from above

Price, time on site and warranty

Published price

Average home: $11,100 to $14,500 in asphalt

The same average roof (18 squares, average pitch, one-layer tear-off) runs $22,300 to $29,400 in standing-seam metal and $26,600 to $33,700 in cedar shake. All three come straight from the per-square table. The calculator uses your own size, pitch and tear-off.

Time on site

1 to 2 days on site for most homes; 3 to 5 days for steep, metal or cedar roofs.

Warranty

15-year Beacon Watch workmanship warranty, plus the manufacturer's material warranty.

Signs it's time

What homeowners usually notice first

  • Shingles curling, cupping or cracking, or granules piling up in the gutters
  • Daylight in the attic, or damp insulation after a hard rain
  • A roofline that sags between the rafters
  • The roof is past 20 years and the repair bills keep coming
  • Two layers already on: a third would void any new shingle warranty

Not sure? Stay off the ladder. Send ground photos with your estimate request and we'll tell you what we see.

Included, always

Line by line, in every quote

  • On-roof (or drone) measure and a core sample of the existing roof
  • Full tear-off. We quote an overlay only if you insist, and we'll explain why we'd rather not
  • Deck re-nailed to current code; rot replaced at the published $85 per sheet
  • Ice-and-water shield at eaves and valleys, synthetic underlayment everywhere else
  • All-new flashing and pipe boots, never reused, no exceptions
  • Open metal valleys and continuous ridge venting
  • Magnetic nail sweep at clean-up and again at the final walkthrough
  • 15-year workmanship warranty registered in writing to your address

Three materials

Priced per square, with the lifespan next to it

Price all three for your roof →
  • Aerial view of a two-storey house with a new grey architectural shingle roof and dormers

    Architectural asphalt shingle

    $465 to $640 per square

    Lasts 22 to 28 years

    The best value per year of dry house for most homes in the valley.

  • Grey standing-seam metal roof with crisp vertical panel lines over a white-walled house

    Standing-seam metal

    $1,050 to $1,425 per square

    Lasts 40 to 60 years

    Buy one roof instead of two, and shrug off hail that bruises shingles.

  • Close view of a weathered cedar shake roof with layered hand-split shakes running up to the ridge

    Cedar shake

    $1,275 to $1,650 per square

    Lasts 30 to 40 years with care

    Character-district and lakefront homes where the roof is part of the architecture.

How the job runs

Six steps, no surprises left in them

  1. Step 1: Free measure

    On the roof or by drone, plus a core sample so we know how many layers are up there. About 45 minutes; you don't need to be home.

  2. Step 2: Written quote

    Line by line, fixed for 30 days. If prices drop before you sign, the quote drops too.

  3. Step 3: Site protection

    Tarps over plants, plywood paths on the lawn, and the dumpster placed where you say.

  4. Step 4: Tear-off and deck check

    Any bad decking is photographed and texted to you at $85 a sheet before we replace it.

  5. Step 5: Dry-in the same day

    Ice-and-water shield and underlayment go down before the crew leaves. A Beacon roof never sleeps open.

  6. Step 6: Install, sweep, walkthrough

    New roof, two magnet sweeps, a walkthrough with you, and the warranty registered to your address.

A roofer tearing worn asphalt shingles off down to the wood deck, with a ladder resting on the roof
Tear-off day: everything comes off down to the deck, so we can see (and photograph) what the old roof was hiding.

From the project log

Jobs like this one, told honestly

All six project stories →

Straight answers

Roof replacement questions

Can you put new shingles over the old ones?

We can, but we'll try to talk you out of it. An overlay traps heat, hides rot and voids most shingle warranties. It also leaves the next roofer two layers to remove. If you still want one after hearing why, we'll quote it in writing.

How long does a roof replacement take?

Most average homes take one or two days on site. Steep, metal and cedar roofs take three to five. We'll give you the number of days in the quote, and if we run long on a fixed-price job, that's on us.

What if it rains on install day?

We watch the forecast and only open as much roof as we can dry in that day. If weather turns, the crew covers the open section before anything else. Your house stays dry either way.

Will my yard be a mess?

Plants get tarped, the lawn gets plywood paths, and we run the magnetic sweeper twice: once at clean-up and again at the final walkthrough. If you find a nail later, call us and we'll come sweep again.

More questions? Read the full FAQ or call (555) 014-8830. A person answers Monday to Saturday.

Other services

Free estimate

Price your new roof before anyone climbs a ladder

The calculator uses the same per-square table our estimators do. Run your numbers, then book the free on-roof measure. No pressure visit, no 3-hour kitchen-table pitch.

Run the roof calculator Or call (555) 014-8830

State roofing contractor license #ROOF-041877 · $1,000,000 surety bond · 15-year workmanship warranty

Call Beacon
Fictional sample site by SearchPod